LIST PROJECTS EXPERIENCE:


In 1998, to inject steam CALTEX –Light Oil Steam Flood (LOSF) Project ordered some Steam Generators from PT Fajar Mas Murni in Turnkey project contract terms. As a main contractor PT Fajar Mas Murni chose us to do supply of control room and integration of plc  and mcc. We successfully completed for 7(seven) units of control rooms which were used to control 21 steam generators.  
Following the 1st projects we got job again to supply control room for Water Treating Plant in CALTEX Minas. US Filter Pte. Ltd affiliate with PT Erra Enersis Konstruksindo, a local company, subcontracted for providing their filter with plc-mcc control system. The integration took around 3-4 months. In January 1999 the materials completely delivered to CALTEX.
In 1999, we supply the control room for CALTEX-Lignin Project.
Since our customer’s specification need customized design, we  engineered OEM Module of Cutler-Hammer MV Switchgear/MCC while PT Citra Interlindo doing it’s fabrication. The equipment was sent to CALTEX-Bangko Project.
After winning tender in YPF Maxus, we executed the job for suplying control generator-sets which were going to be installed in one of Maxus's oil field in Pabelokan Island, South Sumatra, Indonesia.
It is our experience in offshore platform to supply power control room which is pressurized. We got principal to provide the building with z-purge equipment. The control consist of 4160V starter and Switchgear.
Caltex AWT
Uninterruptable Power becomes a critical in banking industrial, because of electronic data utilization. BRI, one of banking owned by government anticipate the need of ATS(Automatic Transfer Switch).
Through our partner, our company design and supply th ATS to the BRI bank. 